Work Package 3
WP3 (Sub-project 4 and Sub-project 5) - Modernization and upgrading of the equipment of the R/V PHILIA
Responsibles: Dr. M. Giannoulaki (HCMR), Prof G. Zarafonitis (NTUA)
Duration: 48 months (Μ1-Μ48), (01/01/2018 - 31/12/2021)
Sub-Action 4: Modernization and purchase of marine and fishing gear
Implementation in the Region of Crete
The purpose of supplying and installing fishing gears is to accurately navigate the vessel, make more efficient and accurate sampling, safer and more accurate dumping of scientific instruments, and target specific bent or inter-shore trawling.
The purpose of replacing and upgrading shipping software and electronic maps is to contribute with precision in:
- assessing the state of the fish stocks
- monitoring the quality of water, marine organisms and pollution; and
- coastal zone management
The purpose of equipment installation for satellite Internet and Fax is to acquire the ability to communicate when running programs on the open sea or in international waters.
Subproject 5: Modernization of the scientific equipment
Implementation in the Aegean Region
The objective of purchasing and installing scientific equipment (a Multi-beam sonar and a sampler (Rosette and CTD) for the measurement of chemical and biological parameters in the water column) is to upgrade the operational capabilities of HCMR by ensuring maximum flexibility in the execution of research programs.
Deliverables of WP3
Deliverable | Title | Deadline |
---|---|---|
D3.1 | Procurement Report and supervision of the procurement and installation work of the equipment. Technical report | Μ48 (31/12/2021) |
D3.2 | Purchase and Installation of Equipment of Sub-Project 4 | Μ48 (31/12/2021) |
D3.3 | Purchase of Equipment of Sub-Project 5 | Μ48 (31/12/2021) |